The equipment working voltage: 220V+ 10%, 50 hz, three phase four wire input/ 1.5m
Total equipment capacity: 1kVA
The parameters of the withstand test unit are as follows
High voltage test voltage: 2500V and 0 ~ 5000V voltage adjustable
Test time 1s: It can be set arbitrarily in 1s ~ 60s
Leakage current: 0 ~ 100mA, can be set arbitrarily
Input pressure: 0.5-0.8mpa
The equipment shall be put into the test line manually, and the whole detection process will be completed automatically Equipment insulation resistance of 10 or higherm Ω.The unqualified product is automatically pushed into the feeding channel by the cylinder.
Site of product test and test:
A. closing state: pressure between phase and phase;
B. Closing state: pressure on the handle of the product base;
C. Brake state: pressure between incoming and outgoing lines
The equipment working voltage: 220V+ 10%, 50 hz, three phase four wire input/ 1.5m
Total equipment capacity: 1kVA
The parameters of the withstand test unit are as follows
High voltage test voltage: 2500V and 0 ~ 5000V voltage adjustable
Test time 1s: It can be set arbitrarily in 1s ~ 60s
Leakage current: 0 ~ 100mA, can be set arbitrarily
Input pressure: 0.5-0.8mpa
The equipment shall be put into the test line manually, and the whole detection process will be completed automatically Equipment insulation resistance of 10 or higherm Ω.The unqualified product is automatically pushed into the feeding channel by the cylinder.
Site of product test and test:
A. closing state: pressure between phase and phase;
B. Closing state: pressure on the handle of the product base;
C. Brake state: pressure between incoming and outgoing lines